HSD-C Series
- Durable material cabinet with black paint design for Anti-oxidation,weatherproof and longer service life.
- Replace easily: Base(Fix inside the road), Body(Detachable)
- Function:Constant lighting, Flashing, Sequential flashing, Synchronized flashing(Custom function)
- Waterproof: IP68
- Can connect with Signal Light
- Low maintenance cost
SKU: HSD-C Series
Category: Road Stud
SPECIFICATION
LED Brick
Item No. | HSD-C-45*25 | HSD-C-48*14 | HSD-C-30*10 |
Material | Polymer composite material + single-layer quartz pebble | Polymer composite material + single-layer quartz pebble | Polymer composite material + single-layer quartz pebble |
Led Brick size | 450*250*50mm | 480*140*50mm | 300*100*50mm |
LED color | Red/Green/White/Custom | Red/Green/White/Custom | Red/Green/White/Custom |
Light power | Red 10.5W,Green 7.4W , White 9.1W | Red 10.32W,Green 14.88W | Red 10.32W,Green 14.88W |
Voltage | DC24V | DC24V | DC24V |
Working temperature | -40℃~+80℃ | -40℃~+80℃ | -40℃~+80℃ |
Loading capacity | ≥40 Tons | ≥40 Tons | ≥40 Tons |
Waterproof | ≥IP68 | ≥IP68 | ≥IP68 |
Led brick body water absorption | 0.04% | 0.04% | 0.04% |
Ground Cage Embedded Parts
Item No. | HSD-C-45*25 | HSD-C-48*14 | HSD-C-30*10 |
Material | Galvanized steel | Galvanized steel | Galvanized steel |
Dimension | 460mm*260mm | 500*150mm | 320*110mm |
Control System
Input voltage | AC220V |
Rated output voltage | DC24V |
Rated output power | 1400W |
Standby power consumption | ≤10W |
INSTALLATION
Installation address(Recommend)
Crosswalk, Pedestrian waiting area, etc.
Installation method
- Placing isolation equipment before installation to ensure the personal safety of staff.
- Measuring, positioning, laying out.
- Cutting and excavation of water stable layer. The excavation depth is 350mm; the excavation width is 700mm (corresponding to 400mm×200mm bricks) for the luminous bricks inlaid in the pedestrian waiting area, motor vehicle stop line, and zebra crossing; the excavation length is the overall length of the floor tiles to be laid, one row One-time laying of floor tiles.
- Embedded embedded parts. The embedded parts include the hot-dip galvanized base and the cable protection tube of the size required by the project. The cable protection tube is cut to a suitable length and penetrated into the opening of the embedded part; The cable threading pipe is Φ50SC, and the cable threading pipe doubles as a drainage pipe.
- Pre-embed the foundation of the control box and build a threading well.
- Base with reinforcement.
- After the concrete is poured, use a vibrating rod to make it uniform, and the concrete pouring height is 3cm lower than the ground.
- Asphalt is laid 3cm from the ground. After the asphalt is laid, compact it with a small road roller or tamper.
- Thread cables and install led brick.
- Connect the 220V power supply and the traffic light signal to the control box and debug it.